[Access, Permissions, Security]
A company-managed project has issue-level security configured, with two security levels. However, Andre only sees one of them in the Security Level dropdown field. Identify a possible reason.
[General Project Configuration]
* Move all issues in version 1.1 to version 1.2.
* Remove version 1.1 as an available option from the Fix Versions system field.
Which two operations will both meet the requirements? (Choose two.)