Correct Answer: D
Explanation:
The correct answer isD. IAM'sAnatomy of Asset Management Version 4states that maintenance regimes may be determined using reliability engineering techniques such asFMECA, Reliability Centred Maintenance (RCM), and Risk-Based Maintenance or Inspection (RBM/RBI). These techniques are used during maintenance strategy development to determine what maintenance is needed and on what basis.
The IAM-alignedGFMAM Maintenance Frameworkis especially clear on the relationship. It says thatasset maintenance strategy developmentproduces the key deliverables ofasset maintenance plans, which specify thenature and frequency of proactive maintenance interventions. It also states that, for critical assets,risk-based and data-driven analytical techniquessuch asRCM and RBImust be used in determining maintenance plans and tasks. Then, in the work management section, it explains thatwork planningdevelops the work packages needed to execute those maintenance plan activities. In other words: RBM determines and optimizes the maintenance tasks and frequencies; work planning then converts those into executable work packages. That is exactly optionD.
Why the other options are incorrect:
Ais incomplete and misleading because RBM does more than identify failure modes for repair tasks; its role is to help determine the optimizedmaintenance tasks and frequenciesfor the maintenance plan.
Breverses the logic. Historical maintenance performance can inform RBM, but it is not the starting-point definition of the relationship.
Cis incorrect because CMMS supports execution and control of work, but it does not replace RBM methodology or generate RBM from work optimization outputs.
Eis incorrect because there is a direct relationship between RBM and planned maintenance; RBM informs the maintenance plan, and work planning executes it.